Skip to content

PATAS v3: customer-first validation and benchmark-gated build #8

Description

@kiku-jw

Result

Validate and sell one bounded PATAS historical spam-campaign audit before
building a new v3 runtime. The benchmark is the paid pilot's acceptance
contract, not a pre-customer implementation phase.

Context

  • The durable product and architecture source is
    docs/v3/BRIEF.md.
  • The current market, competitor, economic, data-access, technical, and
    anti-slop synthesis is
    docs/v3/research/README.md.
  • The current Core is a reference baseline, not a clean production foundation.
  • PATAS is historical pattern/control discovery; TAS remains the separate live
    filtering concept.

Decisions

  • Conditional GO for a paid customer/data validation; NO-GO for a new v3 build
    until both gates pass.
  • First-cohort hypothesis: a company-backed UGC/support operator with paid
    staff, recurring cross-message campaigns, an authorized abuse-plus-legitimate
    export, and a PostgreSQL-backed review/control surface.
  • Founding money probe: a scoped $500 offline audit after metadata-only data
    preflight, with one frozen PostgreSQL replay adapter and no live integration.
  • Exact, character, entity, and sparse methods are baselines. Dense semantics
    is a challenger and is removed if it adds no future-slice control yield.
  • Rules remain typed, cited, replayed, and human-approved. No raw LLM SQL or
    automatic production enforcement.
  • Data possession or de-identification alone does not establish processing
    rights; provenance, authorization, purpose, retention, and deletion are
    separate.
  • Owner authorization for the bounded customer-validation sprint was granted
    on 2026-07-17: up to 20 individually verified first touches, at most two per
    day, one follow-up per contact, asynchronous qualification, and up to five
    identical $500 offers after all qualification gates pass.

Acceptance

  • Critical market, competitor, economics, data-access, technical, and
    adjacent-use-case research is published.
  • Buyer qualification, fixed artifact contract, benchmark contract, and
    prospect/cohort kill rules are documented.
  • Bounded customer-validation execution is owner-authorized.
  • At least 5 of 15 qualified operators confirm the owner-set pain threshold.
  • At least 3 of 10 data-qualified prospects can provide usable authorized
    abuse and legitimate history with future replay coverage.
  • At least 1 of 5 concrete paid founding-pilot offers is accepted.
  • One paid pilot produces a deployed control or review shortcut with
    measured work reduction under the buyer's legitimate-error ceiling.
  • Three customers share 70-80% of the pipeline and at least one wants a
    repeat audit before broader v3/platform work.

All numeric thresholds above are owner-set falsifiers, not market statistics.

Current handoff

  • State: Waiting.
  • Next Actor: External.
  • Outcome: The single final Mumsnet follow-up was sent in the original thread on 2026-07-29. A fresh readback found no human reply or verified bounce, so that lane is closed to further outreach. The cohort remains at eight first touches, now with four final follow-ups sent or accepted, one substantive platform-boundary reply, and zero qualified buyers.
  • Evidence: PATAS-TAS/PATAS@de6077a; docs/v3/research/PROSPECT-COHORT-30.md; knowledge/completions/2026-07-29-mumsnet-final-follow-up.md.
  • Remaining: Wait for a real inbound response or the next permitted follow-up window. PistonHeads opens from 2026-08-03; The Student Room and Digital Spy open from 2026-08-04 through 2026-08-06. Every action requires a fresh reply and bounce scan.
  • Next: Do not contact Mumsnet again. At the next dated window, rescan the mailbox and send at most the single already-authorized final follow-up only if no response or bounce cancels it.
  • Gate: No customer rows, contract deviation, production access, custom development, price or scope change, or new v3 implementation before payment, metadata fit, processing terms, and explicit data authorization.
  • Source: PATAS-TAS/PATAS@de6077a2296d9c06713abe67fabd6a509f90ad0d.

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions