Reconstruction is a feature in go-consequences we seek to include. This ticket is for evaluating the strategy and structural changes expected in the code base to plan out the feature.
- is this a relevant change to go-consequences or should this be in consequences-runner?
- evaluate what parameters need to be tracked for reconstruction, identify all interfaces that need to be created or extended
a. is reconstruction period a damage category or occupancy or structure level attribute? what does it contain?
b. what other reconstruction parameters need to be tracked? number of times damaged? if it is in the flood zone (eo11988 compliance)
c. how do we want to handle events? do we extend the consequences receptor interface to allow for an array of hazards? how do we want to manage it?
d. do we need hazard provider changes?
- given the parameters develop psuedo code for how reconstruction would be accomplished.
Reconstruction is a feature in go-consequences we seek to include. This ticket is for evaluating the strategy and structural changes expected in the code base to plan out the feature.
a. is reconstruction period a damage category or occupancy or structure level attribute? what does it contain?
b. what other reconstruction parameters need to be tracked? number of times damaged? if it is in the flood zone (eo11988 compliance)
c. how do we want to handle events? do we extend the consequences receptor interface to allow for an array of hazards? how do we want to manage it?
d. do we need hazard provider changes?