Skip to content

Feedback tests for async and sync profiles #61

Feedback tests for async and sync profiles

Feedback tests for async and sync profiles #61

Triggered via push February 25, 2026 10:27
Status Failure
Total duration 47m 17s
Artifacts –

test.yaml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

7 errors
test (ubuntu-latest, 3.14)
Process completed with exit code 1.
test (ubuntu-latest, 3.11)
The strategy configuration was canceled because "test.ubuntu-latest_3_14" failed
test (ubuntu-latest, 3.11)
The operation was canceled.
test (ubuntu-latest, 3.12)
The strategy configuration was canceled because "test.ubuntu-latest_3_14" failed
test (ubuntu-latest, 3.12)
The operation was canceled.
test (ubuntu-latest, 3.13)
The strategy configuration was canceled because "test.ubuntu-latest_3_14" failed
test (ubuntu-latest, 3.13)
The operation was canceled.