Repository navigation
Mongo transactions #2300
Triggered via pull request
September 8, 2025 18:53
Status
Cancelled
Total duration
5m 10s
Artifacts
–
tests.yml
on: pull_request
Setup & Build Docker Image
32s
Unit Test
1m 7s
Matrix: Adapter Tests
Annotations
9 errors
|
Adapter Tests (Pool)
The operation was canceled.
|
|
Adapter Tests (Pool)
Canceling since a higher priority waiting request for Tests-refs/pull/690/merge exists
|
|
Adapter Tests (SharedTables/MySQL)
The operation was canceled.
|
|
Adapter Tests (SharedTables/MySQL)
Canceling since a higher priority waiting request for Tests-refs/pull/690/merge exists
|
|
Adapter Tests (MySQL)
The operation was canceled.
|
|
Adapter Tests (MySQL)
Canceling since a higher priority waiting request for Tests-refs/pull/690/merge exists
|
|
Tests
Canceling since a higher priority waiting request for Tests-refs/pull/690/merge exists
|
|
Adapter Tests (Mirror)
The operation was canceled.
|
|
Adapter Tests (Mirror)
Canceling since a higher priority waiting request for Tests-refs/pull/690/merge exists
|