Type: AFK · Source: PRD v1 · Stories: 29, 30, 31
What to build
Pre-Run cost controls: a per-Run cost estimate derived from Perception Mode × step budget (aware of the selected model's pricing), shown before launch in the Dashboard and CLI; a model swap control via the Model Provider port (default Claude Sonnet 4.6); and a cheap a11y-text-only Run preset (e.g. Claude Haiku 4.5) so many sessions can be run inexpensively.
Acceptance criteria
Blocked by
Type: AFK · Source: PRD v1 · Stories: 29, 30, 31
What to build
Pre-Run cost controls: a per-Run cost estimate derived from Perception Mode × step budget (aware of the selected model's pricing), shown before launch in the Dashboard and CLI; a model swap control via the Model Provider port (default Claude Sonnet 4.6); and a cheap a11y-text-only Run preset (e.g. Claude Haiku 4.5) so many sessions can be run inexpensively.
Acceptance criteria
Blocked by