Skip to content

Roadmap to 1.0 #39

Open
Open

Description

@neardws

Updated 2026-11-06 (Pacific/Honolulu). Stow Roadmap Project is the single place to maintain current task status and priority. Use Workflow for status and Priorities for P1 → P3 ordering. This issue retains goals, decisions and delivery evidence; do not maintain a second live checklist here. ROADMAP.md describes scope, PARITY.md distinguishes implementation from native evidence, and #38 holds the acceptance matrix.

Delivery evidence snapshot — 2026-11-06

Acceptance and delivery scope — status lives in the Project

Remaining defects, deferred and long-term

Approved ArcZip follow-up — scope index

The user approved the assessment and the first functional wave on 2026-11-06, then chose the Project as the progress/priority interface. Existing issues were linked directly; no duplicate task cards or PR cards are required.

Issue bodies own requirements, constraints, evidence and linked PRs. The Project owns Backlog / In Progress / In Review / Blocked / Done and P1 / P2 / P3. New backlog issues are planning scope, not implementation assignments or delivery promises. Move a task to Done only when its scoped completion is accepted; keep verification gaps open even if related code has merged.

Codex / Grok Bot owns functional behavior, security, state, cancellation and tests; Claude Code owns visual design and motion. No new Claude Code assignment or visual approval is claimed. Full VoiceOver acceptance remains deferred under #93. Existing multiwindow, drafts, selected-path stripping and basic Keychain work must not be duplicated.

Original implementation checklist — historical

Completed initial tasks: #1, #3, #4, #5; editing #7–#11; Glance/Tray #12/#13; Wave 3 #14–#24; design foundations #25–#31; release tooling #33–#37. Closed task status is not proof of full media delivery, tap publication or exhaustive accessibility acceptance. #32 and #38 remain open for their documented acceptance, with the newer follow-ups above making the remaining scope explicit.

Claude Code owns visual/motion design; Codex/Grok Bot owns functional correctness, state, security, cancellation and tests. No new assignment or visual sign-off is implied by this bookkeeping update. User-confirmed priorities supersede older comments.

Activity

  1. neardws commented on Oct 22, 2026

    @neardws
    MemberAuthor

    Next backlog (competitor parity — external UX only)

    Opened from the post-0.1.0 gap pass (public features / interaction only; no DRM, unsandboxed main app, or third-party internals):

    Still open from earlier waves: #32 (App Group + clean-Mac Gatekeeper), #38 (manual tests), #69 (real demo / website media).

    In flight as PRs (no new issues): #73 App Group, #74 Homebrew cask audit token, #75 in-app / sample Quick Look blank preview.

  2. neardws commented on Oct 23, 2026

    @neardws
    MemberAuthor

    Progress note (2026-10-23, Asia/Shanghai): checklist above is still accurate for open items — only #32 and #38 remain unchecked for the 1.0 gate.

    Since this issue was filed, wave/release work landed on main including Keychain vault (#76/#80), richer DMG packing (#77/#81; AES password + Finder chrome deferred as #84/#85), streaming listings (#78/#82), and notarized v0.1.0 / v0.1.1.

    Follow-ups opened for the remaining polish gaps: real Open Recent docs/verify (#83), Glance colourful window controls (#86). ROADMAP/PARITY header still wrongly said “no signed build / no release”; syncing in the PR for #83/#86.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions