docs: triage ECC upstream commits 4e66b288..e9c88458#66
Conversation
Audit log for the 2026-05-12 upstream sync round. Records 159 focused commits (ECC HEAD e9c88458, evaluated since the maintainer's informal cutoff at 4e66b288) bucketed by path. Documents which commits port, which defer, and which skip with per-commit rationale. Bucket totals (focused range, 159 commits): - A:skills 14, A:rules 0, A:docs 14, B:agents 0 - C:commands 9, E:shared-logic 63 - F:ci 2, D:other-harness 41, H:meta 8, X:needs-review 8 Round 2 port targets (9 confirmed + 5 evaluate + 3 deferred net-new): - skill curation: fd95cf6, 105b524, 12e1bc4, d8f879e, e5229ce, 2bb88cf - hooks / validators: 0dcde13, e196f8a (+ 4 to evaluate) - plan command: 17aafc4 - MCP disable guidance: 2fd8dfc (evaluate) The 1367-commit older range (9db98673..4e66b288) is recorded as evaluated en-bloc, not commit-by-commit. Top file-touches in that range concentrate on multi-harness plugin paths (.cursor/, .kiro/, .opencode/, .agents/, ecc2/) and ECC's own runtime tooling — categories EGC consciously diverges from. The maintainer's hand- tracking through 4e66b288 covers any high-yield upstream change in that range that warranted attention. The audit log proposes 5 follow-up PRs (4 ports + 1 baseline advance). PRs 1-4 can land in parallel; PR 5 must be last and closes #60 when the drift workflow next runs. Lint clean. 264/264 tests pass. Doc-only change.
|
No actionable comments were generated in the recent review. 🎉 ℹ️ Recent review info⚙️ Run configurationConfiguration used: Path: .coderabbit.yaml Review profile: ASSERTIVE Plan: Pro Run ID: 📒 Files selected for processing (1)
WalkthroughThis PR adds a single audit log file documenting a systematic commit-by-commit triage of 1526 upstream commits. The log defines bucketing rules, enumerates per-bucket disposition decisions (port/skip/defer/evaluate), summarizes aggregate counts, and recommends ordered follow-up PR groupings for integration work. ChangesUpstream Sync Round Audit Log
Estimated code review effort🎯 1 (Trivial) | ⏱️ ~3 minutes Possibly related PRs
Suggested labels
🚥 Pre-merge checks | ✅ 5✅ Passed checks (5 passed)
✏️ Tip: You can configure your own custom pre-merge checks in the settings. ✨ Finishing Touches🧪 Generate unit tests (beta)
Thanks for using CodeRabbit! It's free for OSS, and your support helps us grow. If you like it, consider giving us a shout-out. Comment |
Summary
Audit log for the 2026-05-12 upstream sync round. Records the 159 commits between the maintainer's informal cutoff (`4e66b288`, 2026-04-21) and the current ECC HEAD (`e9c88458`, 2026-05-11) bucketed by path. Each commit gets a per-commit disposition (port / defer / skip) with one-line rationale.
The 1367-commit older range (`9db98673..4e66b288`) is recorded as evaluated en-bloc — its file-touches concentrate on multi-harness plugin paths and ECC-only runtime that EGC consciously diverges from.
Doc-only PR — no source changes here. Subsequent port PRs reference rows from `upstream/sync-rounds/2026-05-12.md` by SHA.
Bucket totals (focused 159-commit range)
Port plan
Follow-up PRs (in suggested order)
The audit log proposes 5 PRs; 1–4 can land in parallel, PR 5 must be last:
Out of scope
Test plan
Summary by cubic
Adds
upstream/sync-rounds/2026-05-12.md, an audit log for the 2026-05-12 upstream sync that buckets recent ECC commits and records per-commit port/skip/defer decisions plus proposed follow-up PRs. Docs-only; no source changes.Written for commit 168920e. Summary will update on new commits.
Summary by CodeRabbit