Skip to content

docs: triage ECC upstream commits 4e66b288..e9c88458#66

Merged
Jamkris merged 1 commit into
mainfrom
docs/upstream-sync-2026-05-12
May 12, 2026
Merged

docs: triage ECC upstream commits 4e66b288..e9c88458#66
Jamkris merged 1 commit into
mainfrom
docs/upstream-sync-2026-05-12

Conversation

@Jamkris
Copy link
Copy Markdown
Owner

@Jamkris Jamkris commented May 12, 2026

Summary

Audit log for the 2026-05-12 upstream sync round. Records the 159 commits between the maintainer's informal cutoff (`4e66b288`, 2026-04-21) and the current ECC HEAD (`e9c88458`, 2026-05-11) bucketed by path. Each commit gets a per-commit disposition (port / defer / skip) with one-line rationale.

The 1367-commit older range (`9db98673..4e66b288`) is recorded as evaluated en-bloc — its file-touches concentrate on multi-harness plugin paths and ECC-only runtime that EGC consciously diverges from.

Doc-only PR — no source changes here. Subsequent port PRs reference rows from `upstream/sync-rounds/2026-05-12.md` by SHA.

Bucket totals (focused 159-commit range)

Bucket Count
A:skills 14
A:rules 0
A:docs 14
B:agents 0
C:commands 9
E:shared-logic 63
F:ci/packaging 2
D:other-harness 41
H:meta 8
X:needs-review 8

Port plan

Category Port now Evaluate during port Defer (net-new, bigger scope) Skip
Skill curation 5 3 6
Hooks + validators 2 4 57
Commands 1 8
Docs (incl. MCP guidance) 1 1 21
Other (D/F/H/agents/rules) 0 50
Total 9 5 3 142

Follow-up PRs (in suggested order)

The audit log proposes 5 PRs; 1–4 can land in parallel, PR 5 must be last:

  1. `port: skill curation updates from ECC` — covers `fd95cf6`, `105b524`, `12e1bc4`, `d8f879e`, `e5229ce`, `2bb88cf`
  2. `port: hook + validator fixes from ECC` — covers `0dcde13`, `e196f8a` (+ 4 to evaluate)
  3. `port: plan command graceful degradation` — covers `17aafc4` (can ride along with PR 2)
  4. `port: MCP disable guidance update` — covers `2fd8dfc` if portable (can ride along with PR 1)
  5. `docs: advance upstream baseline to e9c88458` — updates `upstream/.upstream-sync.json` + `upstream/README.md` (+ ko-KR / zh-CN mirrors). Closes #60 when the drift workflow next runs.

Out of scope

  • The 3 deferred net-new ECC skills (`tinystruct-patterns`, `ios-icon-gen`, `flox-environments`). Worth its own round once this one lands.
  • A schema split between `lastSyncedSha` and `lastEvaluatedSha`. Defer.

Test plan

  • `npm run lint` — clean
  • `npm test` — 264/264
  • Bucketing heuristic verified by sampling each bucket (skills/rules/docs/commands/hooks/CI/skip)
  • EGC file matches verified for every `port` row (e.g. `scripts/hooks/block-no-verify.js`, `scripts/ci/validate-skills.js`, `commands/egc-plan.toml`)

Summary by cubic

Adds upstream/sync-rounds/2026-05-12.md, an audit log for the 2026-05-12 upstream sync that buckets recent ECC commits and records per-commit port/skip/defer decisions plus proposed follow-up PRs. Docs-only; no source changes.

Written for commit 168920e. Summary will update on new commits.

Summary by CodeRabbit

  • Documentation
    • Added upstream synchronization audit log documenting commit triage and disposition tracking for the current release round.

Review Change Stack

Audit log for the 2026-05-12 upstream sync round. Records 159
focused commits (ECC HEAD e9c88458, evaluated since the maintainer's
informal cutoff at 4e66b288) bucketed by path. Documents which
commits port, which defer, and which skip with per-commit rationale.

Bucket totals (focused range, 159 commits):
- A:skills 14, A:rules 0, A:docs 14, B:agents 0
- C:commands 9, E:shared-logic 63
- F:ci 2, D:other-harness 41, H:meta 8, X:needs-review 8

Round 2 port targets (9 confirmed + 5 evaluate + 3 deferred net-new):
- skill curation: fd95cf6, 105b524, 12e1bc4, d8f879e, e5229ce, 2bb88cf
- hooks / validators: 0dcde13, e196f8a (+ 4 to evaluate)
- plan command: 17aafc4
- MCP disable guidance: 2fd8dfc (evaluate)

The 1367-commit older range (9db98673..4e66b288) is recorded as
evaluated en-bloc, not commit-by-commit. Top file-touches in that
range concentrate on multi-harness plugin paths (.cursor/, .kiro/,
.opencode/, .agents/, ecc2/) and ECC's own runtime tooling —
categories EGC consciously diverges from. The maintainer's hand-
tracking through 4e66b288 covers any high-yield upstream change in
that range that warranted attention.

The audit log proposes 5 follow-up PRs (4 ports + 1 baseline
advance). PRs 1-4 can land in parallel; PR 5 must be last and
closes #60 when the drift workflow next runs.

Lint clean. 264/264 tests pass. Doc-only change.
@coderabbitai
Copy link
Copy Markdown

coderabbitai Bot commented May 12, 2026

No actionable comments were generated in the recent review. 🎉

ℹ️ Recent review info
⚙️ Run configuration

Configuration used: Path: .coderabbit.yaml

Review profile: ASSERTIVE

Plan: Pro

Run ID: a80d4577-4df2-4144-a499-475e4e20574c

📥 Commits

Reviewing files that changed from the base of the PR and between 02e562e and 168920e.

📒 Files selected for processing (1)
  • upstream/sync-rounds/2026-05-12.md

Walkthrough

This PR adds a single audit log file documenting a systematic commit-by-commit triage of 1526 upstream commits. The log defines bucketing rules, enumerates per-bucket disposition decisions (port/skip/defer/evaluate), summarizes aggregate counts, and recommends ordered follow-up PR groupings for integration work.

Changes

Upstream Sync Round Audit Log

Layer / File(s) Summary
Audit setup and triage methodology
upstream/sync-rounds/2026-05-12.md (lines 1–50)
Establishes scope (baseline 9db98673 → HEAD e9c88458, 1526 commits) and defines the mutually exclusive path-touch bucketing rules: Skills, Rules, Docs, Agents, Commands, Shared-Logic, CI/Packaging, Harness, Meta, and Needs-Review, with bucket counts for the focused range.
Per-bucket commit disposition and category analysis
upstream/sync-rounds/2026-05-12.md (lines 51–196)
Analyzes each bucket's commits with per-commit dispositions (port, skip, defer, evaluate, partial port, needs-review), enumerates representative vs. whole-bucket decisions, identifies portable vs. skipped shared-logic fixes, and covers the older en-bloc evaluation range.
Summary, recommendations, and out-of-scope tracking
upstream/sync-rounds/2026-05-12.md (lines 197–228)
Aggregates disposition counts into a summary table, lists five recommended follow-up PR groupings with commit SHAs and ordering constraints, and documents deferred net-new skills and schema-split items as out-of-scope for this round.

Estimated code review effort

🎯 1 (Trivial) | ⏱️ ~3 minutes

Possibly related PRs

  • Jamkris/everything-gemini-code#56: Establishes upstream-sync baseline (same 9db98673 SHA) and supporting metadata/configuration files that complement this audit log.

Suggested labels

docs

🚥 Pre-merge checks | ✅ 5
✅ Passed checks (5 passed)
Check name Status Explanation
Description Check ✅ Passed Check skipped - CodeRabbit’s high-level summary is enabled.
Title check ✅ Passed The title 'docs: triage ECC upstream commits 4e66b288..e9c88458' accurately describes the main change: a documentation file recording commit triage for an upstream sync round.
Linked Issues check ✅ Passed The PR fulfills issue #60's objective by documenting the commit-by-commit triage between baseline 9db98673 and upstream HEAD e9c88458, enabling advancement of the recorded baseline.
Out of Scope Changes check ✅ Passed The PR is documentation-only, adding a single audit log file that directly supports the linked issue's objectives. No out-of-scope code changes are present.
Docstring Coverage ✅ Passed No functions found in the changed files to evaluate docstring coverage. Skipping docstring coverage check.

✏️ Tip: You can configure your own custom pre-merge checks in the settings.

✨ Finishing Touches
🧪 Generate unit tests (beta)
  • Create PR with unit tests
  • Commit unit tests in branch docs/upstream-sync-2026-05-12

Thanks for using CodeRabbit! It's free for OSS, and your support helps us grow. If you like it, consider giving us a shout-out.

❤️ Share

Comment @coderabbitai help to get the list of available commands and usage tips.

Copy link
Copy Markdown

@cubic-dev-ai cubic-dev-ai Bot left a comment

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

No issues found across 1 file

@Jamkris Jamkris merged commit cf3143d into main May 12, 2026
10 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

Upstream sync: 1526 new commits in ECC since 9db9867

1 participant