Skip to content

Bump actions/checkout from 5 to 6 (#621) #83

Bump actions/checkout from 5 to 6 (#621)

Bump actions/checkout from 5 to 6 (#621) #83

Triggered via push November 25, 2025 01:47
Status Failure
Total duration 47s
Artifacts

Downgrade.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

3 errors and 1 notice
test (1.6)
Process completed with exit code 1.
test (1)
The strategy configuration was canceled because "test._1_6" failed
test (1)
The operation was canceled.
test (1.6)
[setup-julia] If you are testing 1.6 as a Long Term Support (lts) version, consider using the new "lts" version specifier instead of "1.6" explicitly, which will automatically resolve the current lts.