Milestones
List view
Stage 4: organization adoption. Adopt the released profile repository by repository, including Base-supported banyanlabs, organization templates in basefoundry/.github, and open-title migrations after the relevant adoption/template prerequisites. Each product repository keeps its own issue milestones and release; Base 1.15 coordinates and pins ecosystem releases.
No due dateStage 3: drift checks and read-only review. Pin the checker from the released 1.13.0 artifact; run drift checks and the least-privilege read-only reviewer only after their security gates. Exit with reviewed evidence and rollback demonstrated.
No due dateStage 2: deterministic checks. Implement readiness/lifecycle checks and status reconciliation; dry-run first; introduce warn-only rules and the override record. Exit when dry-run results match maintainer decisions on a declared sample and warnings remain non-blocking.
No due dateStage 1: manual loops. Set up the reviewer App (package 26); run #2666 through the first manual Ready review and implement the document/ADR contract; then migrate the Base Project schema and deliver work-item/PR contracts, repository governance configuration, reviewer rules, baseline, conversation-resolution setting, and manual issue/PR pilots. Exit when representative pilots complete the manual loops without bypass and evidence is recorded.
No due date•0/1 issues closedAgent loop L1 (controller, claim/lease, crash-safe ledger, worktree hygiene), the manifest docs block, a workspace-level MCP server, basectl stack test execution and cleanup, and adoption validation (bankbuddy and blend pilots, readiness scorecard, design-partner sprint). Carried over from the old v1.13.0 and still to be re-planned.
No due date•1/20 issues closedAdopt this plan; renumber Base milestones; correct the design; define areas; inventory and reorganize Base documentation; bring base-demo into lockstep; reconcile governance issue scopes and dependencies. Use the accepted design as the interim document contract; the ADR template/index and conversion of durable decisions begin with #2666 in Stage 1. No new governance automation is enabled.
No due date•42/75 issues closedTesting and validation: install-matrix and test-bed scenarios, shell and CI coverage, release-path rehearsal, the release-train contract, gate canaries, matrix-evidence verification and loop replay fixtures. The plan also targets the AI-context replacement export (#2686, #2687) for this release. Carried over from the old v1.12.0 and still to be re-planned: MCP v0 and retrieval, the basectl stack lifecycle, the agent-loop event ledger, Bash/Zsh project activation and command metadata.
No due date•0/30 issues closedIdeas for future, to be taken up for implementation only if there is a significant demand.
No due date•0/20 issues closed