You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
bprail edited this page May 28, 2015
·
9 revisions
A task graph represents a parallel program's execution. It is primarily distinguished from a standard trace by including dependency information. Rather than view a program as independent streams of instructions, the task graph presents discrete tasks that have dependencies to model before each task can be executed.
A task graph is a set of tasks and directed edges. Each task has a type: create, join, sync, barrier, and work. Each task additionally contains a set (possibly empty) of actions - basic blocks and memory accesses.
File Format (task graph version 4315+):
Version Number (4 bytes)
Task Graph Index position (8 bytes)
ROI Start ID (8 bytes) // Inclusive, the first task in the ROI
ROI End ID (8 bytes) // Exclusive, the first task not in the ROI
Task Graph Info structure
Tasks 1 - N
Task Graph Index
N (4 bytes)
TaskId (8 bytes), Offset (8 bytes)