You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
Repository navigation
Land combined dependency snapshots before main-based verification #2505
Land the bounded dependency-review code repair in PR #2492 so a real dependency update can be checked against a new main snapshot.
Code acceptance
Use matching full-tree component detection on main and same-repository dependency PR heads, plus one combined manual npm/uv snapshot per side.
Include every distinct tracked npm lock version and the scoped root uv.lock graph; reject incomplete, extra, wrong-version, wrong-manifest, wrong-scope, or warning-bearing compare evidence.
Keep the current vulnerability/license policy, exact SHA binding, bounded warning retry, Python fallback limitation, and focused regression tests.
Parent issue #2490 remains open after this code lands. Its acceptance requires a new main snapshot and a refreshed original manifest-changing PR with a warning-free hosted policy verdict and complete artifact. The off-main #2501 canary passed all 12 exact lock changes but does not prove that final main-based result.
Activity
linear-code commentedon Oct 29, 2026
GRV-860
github-actions commentedon Oct 29, 2026
👋 Thanks for opening this issue! It has been automatically labeled for triage.
fix: match dependency snapshots on update pull requests (#2492)